Notice of Bids
ALL BIDS, UNLESS OTHERWISE NOTED, CLOSE PROMPTLY AT 3:00 P.M. ON DATE OF BID OPENING. BID DOCUMENTS MAY ALSO BE OBTAINED FROM OUR OFFICE AT:
20 North Main Street, Rm 365, Brooksville, FL 34601
Phone(352) 754-4020 Fax (352) 754-4199
To download documents, CLICK on HIGHLIGHTED, UNDERLINED
DOCUMENT NUMBER. This will be downloaded in a PDF file.
Disclaimer Regarding Accuracy and Legal Effect of Information
The Hernando County Purchasing and Contracts Department makes every effort
to update the information on this site so that it is current. This site
is provided for the convenience of our vendors. No guarantee as to the accuracy
or completeness of the information can be made by the County, and it remains
the sole responsibility of the vendors to ensure they are utilizing the
most current information in responding to Hernando County solicitations.
Please use the contact information provided for each Notice of Bid.
This information is designed solely to provide a general summary to those
wishing to do procurement business with Hernando County. As such, it is
not binding in either a legal or regulatory sense. The procurement activity
of Hernando County is performed in accordance with applicable laws, the
Hernando County Code and other applicable rules and regulation which govern
this information.
NOTICE
Effective
April 18, 2011 Hernando County will post all Bids, RFP's, RFQ's, RFI's
and Quotes through the Florida Online Bid System at
www.FloridaBidSystem.com . Please use the "Vendor Registration" link
to complete the on-line registration. Any currently registered
vendors to this system do not need to re-register separately for
Hernando County.
The County's website for Bid information will NOT contain any opportunities issued from 4/18/2011 forward.
|
Document Number |
Opening Date |
Title |
Addenda |
Pre-Bid Conference |
Bid Tab |
Contact Person |
|
7/7/10
@ 3:00 PM |
Airport
Industrial Park – Unit 1 – Roadway and Drainage Improvements |
Mandatory
prebid 6/15/10 @ 9:00 AM |
||||
|
9/08/10
@ 3 PM |
Sunshine
Grove Rd. Improvements SR 50 to Ken Austin Pky |
Prebid
Meeting 7/12/10 @ 2 PM |
||||
|
8/11/10
@ 3:00 PM |
Ayers
Rd (from US 41 to Culbreath Rd) |
Prebid
meeting 7/28/10 @ 10:00 AM |
||||
|
12/08/10
@ 3:00PM |
Elgin
Blvd (CR 572) from Mariner Blvd to Village Van Gogh Roadway Improvement
Project |
Prebid
meeting 10/4/10 @ 10:00 AM |
||||
|
9/15/10
@ 3:00 PM |
Weeki
Wachee Wastewater Treatment Plant Bypass |
Mandatory
prebid 8/16/10 @ 11:00 AM |
||||
|
8/25/10
@ 3:00 PM |
Brookridge
Force Main Project |
Prebid
meeting 8/2/10 @ 10:00 AM |
10-0084prebidsignin.pdf
10-0084BIDTAB.pdf
Revised
Tab |
|||
|
9/22/10
@ 3:00 PM |
US
19/SR 50 Pump Station and Force Main Replacement Project |
MANDATORY
Prebid meeting 8/16/10 @ 10:00 AM |
||||
|
9/29/10
@ 3 PM |
Citrus
Way Box Culvert Extensions |
Prebid
meeting 8/12/10 @ 2 PM |
||||
|
8/18/10
@ 3:00 PM |
Runways
3-21 and 9-27 Pavement Rehabilitation |
Mandatory
prebid 7/26/10 @ 10:00 AM |
||||
|
9/10/10
@ 5:00 PM |
Update
Landfill Site Master Plan |
Mandatory
Pre-proposal Meeting 8/27/102:30 PM |
||||
|
12/01/10
@ 3:00PM |
The
Northcliffe Force Main Project |
Mandatory
Prebid 10/07/10 @ 10:00AM |
||||
|
11/10/10
@3:00PM |
TOM
VARN PARK TRAIL REPAVING |
|
Prebid
meeting 10/25/10 @ 10:00AM |
|||
|
12/8/10
@ 3:00PM |
Good
Neighbor Trail –Phase IIA |
Prebid-11/10/10
@ 10:00AM |
||||
|
11-0020 |
2/16/2011
3PM |
Airport
Hanger Addition |
|
|
|
|
|
Until
1/18/2011 @ 10:00am |
Hernando
County Online Auction |
|
Inspection
1/14/2011 1:00pm – 3:00pm |
|
||
|
1/22/2011
@ 9:00am |
Hernando
County Public Auction |
Inspection
1/21/2011 1:00pm – 4:00pm |
|
|||
|
3/30/2011
@ 3:00pm |
County
Line Rd & Cobblestone Dr. Intersection Signalization |
MANDATORY
PRE-BID on 3/7/2011 @ 10:00am |
||||
|
4/6/2011
@3:00 pm |
Sign
Blanks, U-Type Channel Sign Posts, Sign Brackets & Complete Signs |
|
|
|||
|
QUALIFICATIONS ARE DUE BY 5 PM
FEBRUARY 28, 2011 (SEE PAGE 3 OF RFP DREDGE) SEALED PROJECT COST AND MEANS AND
METHODS ARE DUE BY 5 PM MARCH 04, 2011 (SEE PAGE 3 OF RFP DREDGE) ORAL PRESENTATIONS WILL BEGIN ON
MARCH 7, 2010 AT 9 AM (SEE PAGE 3 OF RFP DREDGE) |
HERNANDO BEACH CHANNEL DREDGING
PROJECT 11-0027/JMP |
|
|
|||
|
4-06-11@
3:00PM |
LANDFILL EQUIPMENT LEASE THREE YEARS WITH OPTION |
|
||||
|
5-4-11 @ 3 PM |
US19 SOUTH WATER MAIN/FORCE MAIN
EXTENSIONS PROJECT |
MANDATORY
PRE-BID 04/13/11
@ 10 AM |
||||
|
4-20-11 @ 3:PM |
SOUTH BROOKSVILLE VISION AREA
PHASE I |
MANDATORY
PRE-BID 03/23/11 @ 10:00AM |
||||
|
5-4-11 @ 3PM |
PECK SINK PRESERVE IMPROVEMENT
PLANS PROJECT |
MANDATORY
PRE-BID 04/13/11
@ 11AM |
||||
|
Due may 12, 2011 5:00 PM |
Design/Build Jail Infirmary |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|